Beginning in mid to late June 2017, US EPA will be performing maintenance work at the Ambler Superfund Site. The project is expected to last about two months. The purpose of the work is to reinforce the protective soil cap and the drainage systems originally installed in the early 1990s at the Ambler Asbestos Piles Superfund Site. For further information on the Remedy Optimization Work, click on the posting headline. For more information about EPA’s work at the site, visit www.epa.gov/superfund/amblerasbestos