US EPA Remedy Optimization Work

Beginning in mid to late June 2017, US EPA will be performing maintenance work at the Ambler Superfund Site.  The project is expected to last about two months.  The purpose of the work is to reinforce the protective soil cap and the drainage systems originally installed in the early 1990s at the Ambler Asbestos Piles Superfund Site.   For further information on the Remedy Optimization Work, click on the posting headline.  For more information about EPA’s work at the site, visit www.epa.gov/superfund/amblerasbestos

USEPA Remedy Optimization Work Flyer
USEPA Remedy Optimization Work Flyer
USEPA-Remedy-Optimization-Work-Flyer.pdf
299.0 KiB

914 Downloads
Details

Upcoming Meetings

Jan
28
Tue
6:00 pm Planning Commission Comprehensiv... @ Ambler Borough Hall Gymnasium
Planning Commission Comprehensiv... @ Ambler Borough Hall Gymnasium
Jan 28 @ 6:00 pm
The Borough Planning Commission will be hosting an open house regarding the comprehensive plan on Tuesday, January 28th 6pm-8pm.    This event will introduce the public to the planning process of the Comprehensive Plan and request[...]
Meeting Videos
Water Portal Link
Pay Property Taxes